I'm looking into a code compliance issue on a feeder installation and not sure if it meets code or not. The circuit is feed from a 3 phase 600 Amp CB in a switchboard (located outside) with the load side of the CB having 2-350kcmil's per phase. Each set of 350kcmil conductors goes into an underground conduit and lands in a down stream MLO panel (also outside) rated 400 Amps. Does this meet code? or should 2-300 Amp CB's be used in lieu of 1-600A.