We have a commercial building project that was originally drawn for a main breaker transfer switch and an outdoor 1200 amp MLO MDP. The customer removed the generator and transfer switch from the scope so we are left with a MLO MDP with 5 switches that has underground secondary conductors ran from a utility owned transformer. I understand we only have 5 switches and that is under the six switch rule but does the 2021 NEC require overcurrent protection for the secondary conductors coming from the transformer? First time using this forum and I appreciate the help.