I have tranformer 45 kva step down 277/480 to 120/ 208 .Services load in primary total is 60amp secondary is 125amps
the distance from meter to tranformer is 550ft.What size do i need for feeder and 45kva is good enough.
Please give me advise.
thanks
the distance from meter to tranformer is 550ft.What size do i need for feeder and 45kva is good enough.