I've got a new office building going up with 8 office spaces for tenant improvement. Each office space has a calculated load of 87 amps. I'll be providing 100 amp sub panels at 120/208, 3 phase for each office. For my switch gear, how do I calculate the size of the main service disconnect feeding all 8 panels? The power company is providing 120/208, 3 phase to the building?