Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
Ok how about MC cable? Same? Run beforehand?Looks like standard wall construction. From a cost perspective you'll probably want to run the conduit before the walls of up. It would then be fire or draft stopped after the walls were finished. What does the contract say about this? Often the taper seals around the conduits when the wall has no need for a fire rating.
Your details are for sound attenuation through the walls. Are patching around conduits the responsibility of the carpenter or the electrician?What exactly do you mean about how does the contract read? Regarding what?
We need to firestop all penetrations for our raceways.Your details are for sound attenuation through the walls. Are patching around conduits the responsibility of the carpenter or the electrician?