I just roughed a whole house and there is only 1 stack-it on the whole job where I had 3 cables on one side of a stud and couldnt use the other side of the stud because it was under a window. I am just stubborn enough to go back and change it , that way I can see what the inspector does without taking much risk
Thanks george
See 310.15(B)(2).
I have never looked at a listing for cable ties, but I did this morning, just for fun.
Nothing there says anything about how many cables can be under a zip tie, or how strong it has to be.
Nothing there, either.
I would let the inspector do the work to prove that the installation was not code compliant, IMO. The method I described is superior to Stack-Its, IMO.
I just roughed a whole house and there is only 1 stack-it on the whole job where I had 3 cables on one side of a stud and couldnt use the other side of the stud because it was under a window. I am just stubborn enough to go back and change it , that way I can see what the inspector does without taking much risk