walton
Member
- Location
- Sacramento, CA
For Kwired
Here at the Wastwater Treatmant Plant where I am stationed it is common practice to install auxillary grounds at large motors (1250 hp). Not my design. I was using that as an example of an auxillary ground vs GEC. I think I know enough to install the EGC. Thanks anyway for nothing...