Terminating 8/2 MC in plastic EV charger enclosure

I have done maybe 6 in Seattle with a permit, and never installed a lockout. A few of those were in sight, but I don't think it's required. To me that would be the same thing as picking sections out of article 422 for a transformer install. I don't see an EVSE being any more of appliance than a transformer is.
Well the lockouts are silly anyway for most brands like eatons so in all honesty it won't make any difference to someone who knows not to mess with it live.
 
Top