JJWalecka
Senior Member
- Location
- New England
If a 150 kva transformer is prefabbed off-site with Greenfield and conductors terminated for both primary and secondary... would the handling of the equipment during shipping, delivery and installation require the terminations to be cut...restripped and torqued again?
Is there an article or reference material that could provide facts on how many nontorqued terminations fail....for instance during fault events where high short circuit currents flow
Is there an article or reference material that could provide facts on how many nontorqued terminations fail....for instance during fault events where high short circuit currents flow