There is a large 1000a 480V main distribution board in a electrical room which contains a 200A breaker for our use. I am showing a new wire way coming out of the MDP which will contain a 200A feeder from the breaker, through the wire way, and to a new meter.
Can I go straight from the meter right to our new transformer, or do I require OCP on the primary side? There is already OCP on the primary side but it is before the meter which is strange to me in this case.
Thanks!