Charge them your engineering fee to pre inspect their process and facilities before you will approve of the purchase.
Then, you have to go back, oh and you have to go back, then the delay for the documentation is happening. You have more fee necessary to find out what the docs holdup is.
If there is a DQ on the drive to their production facility, that's a twofer. But if you spend all the 16k at the DQ trying to get the inspection done, that's bad for you.
Then, you have to go back, oh and you have to go back, then the delay for the documentation is happening. You have more fee necessary to find out what the docs holdup is.
If there is a DQ on the drive to their production facility, that's a twofer. But if you spend all the 16k at the DQ trying to get the inspection done, that's bad for you.