If the primary swgr voltage is 2.4KV (upstream transformer secondary is 2.4KV) and this switchgear falls under the 5KV MV category. In this case, can I use a 4160:120V PT and 4160:120/240 CPT as part of the drawer ? The primary operating Voltage is 2.4KV.