I don't have my book handy & need to give a quick answer shortly. I think I recall that with upsizing for voltage drop, the ground has to be sized up along with the current carrying conductors. I am seeing having to size up from #12 to #2 for a potential but not likely project. So the ground should also be #2. If it were starting with reduced ground for larger load, the ground could still be proportionate per the chart.
Am I correct on this? I think I am. Thx for any feedback.