robby robinson
Member
I have a job, where we have a 2000 amp feeder from one building to another, we are planning on using 6 sets of 750 mcm aluminum, the feeder is 300 foot long and the computed load on the feeder is 1500 amps. from where we terminate the feeder, we then have a sub feeder to a meter bank, 200 feet away, the feeder will be a 600 amp, using 2 sets of 350mcm copper, the computed load on this feeder is 480 amp. from the meter bank to the furthest condo unit is 150 feet, we are using 3/0 aluminum type mc cable to feed the unit, the computed load on each condo unit is 100 amp.
On the 200 amp feeder, we may use a MC Stabiloy cable, rather then metal conduit.
On the 200 amp feeder, we may use a MC Stabiloy cable, rather then metal conduit.