Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
I am estimating a job where the trench/Walker duct has aready been/or will be installed as part of another bid package when we get on site. We are going to have to pull the wires through this existing duct. I would guess that this would be a bit more labor intensive then pulling through pipe, correct?
Thanks.
Thanks.