Customer that is driving me nuts with requests for estimates, change and reprice, what can we do about this, how much.  About a two weeks ago they found a "work around" so they could manage to work when a faulty high bin limit shut things down.  One of my past small PLC projects. They lucked at the solution or worked really hard finding a way.  I want to give them a legal safe option and close the loop hole.  We have been in the discussion stage for all of this week.  Today I told them to make the decision. "S__t or get off the pot!"
Was I too blunt?
About right?
Or
 
Such a whimp, I should be embarrassed.
	
		
			
		
		
	
				