ironphill
Member
- Location
- Conroe, TX
I've never actually gotten tagged on this from a city inspector, but private inspectors site it on existing houses all the time. When all the romex comes into a panel through a single 2 1/2" hole, they call it bundling and then tell the home owner that you can't do that. They've also said it needs romex connectors instead of pop in bushings, but that's beside the point. I've look the code up and down, and the only thing I can find about bundling (that's relevant) is that if you do it for more than 24", you have to derate the wire. So regardless of whether it's "bundled" coming into the panel, it's only "bundled" for a half inch tops. Where in the codebook does it say you can't do that? On a side note, the city inspectors won't let you use mc cable... at all,... anywhere. You have to sleeve you're own stranded with flex. Anybody ever heard of that?