Hi all, Here in San Diego trying to get a replacement service panel installed. POCO is saying that as of January 1st,2017 that CEC hanged and won't allow an electric panel within 36" of a gas riser. POCO cannot provide what article this is covered by. The option provided was to move the service which will require extensive demo of a retaining wall and concrete slab. Anyone familiar with this new change?