Buck Parrish
Senior Member
- Location
- NC & IN
The GC has poured the slab on a large assisted living new constrution job. None of the 3 phase 200 amp feeders were installed under the slab as they usssually would have. There would be numerous transformers, generators , etc...
The contractor is saying to install it (480 V, 3 phase feeders) in SER cable. I never heard of that , have you?
Most of the branch circuits are to be done in romex.
I was wondering what my options are.
The contractor is saying to install it (480 V, 3 phase feeders) in SER cable. I never heard of that , have you?
Most of the branch circuits are to be done in romex.
I was wondering what my options are.