I have two 4" rigid conduits each containing six
500mcm cu conductors. They are feeding a 3 phase
panel with a neutral. My inspector is telling me
that it may not pass. In conduit #1 I have phase A and phase B.
In conduit #2 phase C and the grounded conductor.
I have been going through my book and can't find anything
that says this is a violation. This is the service entrance
from utility transformer. Anyone?
Thanks, Ed
	
		
			
		
		
	
				
			500mcm cu conductors. They are feeding a 3 phase
panel with a neutral. My inspector is telling me
that it may not pass. In conduit #1 I have phase A and phase B.
In conduit #2 phase C and the grounded conductor.
I have been going through my book and can't find anything
that says this is a violation. This is the service entrance
from utility transformer. Anyone?