Today I had to installed a service disconnect for a service. I had to move a meter from one spot to another, but I didn't pass the inspection because I didn't have a service disconnect. My question is (and this may be elementary) why did I need the sevice disconnect? Was it because the extended length of the wire? If the meter is right behind the panel why doesn't it need a service disconnect the only difference is the wire length?