goldstar
Senior Member
- Location
- New Jersey
- Occupation
- Electrical Contractor
Just an FYI, it was done that way originally and passed inspection. That doesn't necessarily make it right though. I don't know how it passed on the original installation based on how poorly it was installed. When I got to the job the first day the service was hanging on by a thread. The meter pan wasn't even attached to the house. The sheathing under the siding was dry-rotted. AND, that was only done 3 years ago.I agree and admit that the LB is easier to install for that reason and looks better when finished. There is always a chance with the LB that an inspector could make you change it.