Do you guys usually bond well casings with whatever equipment ground you run out there? I don't think there's an actual code reference for this- AHJ? I've been looping the equipment ground (#10 or #12 CU solid from the UF cable) out of a drilled hole in the PVC LB and drill/tap a lay-in lug in the well casing for it. I saw someone actually run a dedicated #4 out there just for the well casing (in addition to the equipment ground), I thought, you must be joking.