stevephillips
Member
- Location
- knoxville tn
Was out at a job today to help a buddy with a geothermal heat pump install (needed a 60amp circuit for backup heat) and saw something that I haven't seen in a residential setting before. The homeowner is an engineering type and has installed a power monitoring and managing system. The CTs are installed before the main but inside the panelboard, not in another box. They are wired to the monitoring device along with a voltage signal from a 15amp 2 pole breaker.
Is this legal under NEC 08? (NEC 11 has not been adopted here yet)
Is this legal under NEC 08? (NEC 11 has not been adopted here yet)