I've got two panels that are full in a commercial space due to the past occupancy and I need more circuits in another room as its becoming a small church sancuary. If I wanted to consolidate circuits to create space, can I do it in the panel? or do I have to do it in Jbox or gutter? Most of the load in these panels is purely lighting load, and what ever reason there are like 24 circuits feeding nothing but lighting and recepts in aprox. 1000/sqft. which consist of 4 class rooms, a office, small nursery, and two restrooms. There is already one sub panel, which has the same issue. Im betting if I clamped on a amp meter, the whole panel would be less than 40 amps....
HVAC load is in a adjacent 3ph panel..