mickeyrench
Senior Member
- Location
- edison, n.j.
When testing a generator backup for a 480volt 4000amp. gfci service is the testing person suppose to be a quilfied employee and should he be suited up. Testing can be under a load or not under a load. Also the company policy says no work over 2* hrc. We have never racked out switch gear . We due remove buckets in mcc and according to 70e it a 4 on hrc task list.
Can someone point out the rules on these situations ?
Thanks
Can someone point out the rules on these situations ?
Thanks