The main trips. You are describing a worst case/highest load scenario.
If there is no NEC article that covers this, then a study at another similarly sized facility may be in order. ofc, if you want to make it bulletproof, design it so all 100 carts can be on max charge simultaneously, and bill accordingly. Anything substantially less leaves the possibility of the customer overloading the system. and we dont want that, do we?![]()
The only reason the main would trip in this scenario would be if the electrical was designed short of being able to handle the inrush.
JAP>