Our crew upgraded a single family residential service consisitng of 1-200 amp MBP. The water main was inaccessable so they decided to install 2 ground rods at least 6' apart and 2 seperate runs of #6cu from the bonding bar, 1 to each to each rod.
The Inspector rejected the installation stating that we cannot parallel grounding conductors.
We could have simply jumped the rods together but decided since ther were 2 electrodes required we felt they should be seperate runs.
Im Stumped...
The Inspector rejected the installation stating that we cannot parallel grounding conductors.
We could have simply jumped the rods together but decided since ther were 2 electrodes required we felt they should be seperate runs.
Im Stumped...