12 600s,AU.

12 600s,AU.

Are they going into the pictured panel? Looks like a tight fit, if the PVCs (2) hitting top left are the route.
 

electricalperson

Senior Member
Location
massachusetts
Are they going into the pictured panel? Looks like a tight fit, if the PVCs (2) hitting top left are the route.

the panel is about 12 inches deep. theres 3, 4 inch pvc pipes. and larry the main breaker is in that panel. the EGC bar attaches inside the cabinet.

i terminated the service conductors today and pulled in the feeders. i will take pictures tommorw and post them for your enjoyment. i think the service conductors look pretty good i worked hard on it
 

electricalperson

Senior Member
Location
massachusetts
ok guys here it is. its pretty much all finished except i need 1 more breaker they sent a 100 amp instead of a 200 amp.

100_1677.jpg


100_1689.jpg


100_1690.jpg


100_1688.jpg



100_1692.jpg


100_1691.jpg


100_1693.jpg
 

nunu161

Senior Member
Location
NEPA
What kind of buss is that just wondering about the phase color alignment because in the i-line panels the phases flipover
 