Bonding of service conduit.. do both sides need to be bonded with either a bonding bushing or lock nut, or just one side.
I think just one (panel connector) would suffice but, the couplings and connectors between the panel and meter pan has me questioning it..
chain of events from drop to panel..
seu>meter>conn,>pipe(emt)>couple>90(emt)>conn>panel
Bonding at panel connector only?
thank you
I think just one (panel connector) would suffice but, the couplings and connectors between the panel and meter pan has me questioning it..
chain of events from drop to panel..
seu>meter>conn,>pipe(emt)>couple>90(emt)>conn>panel
Bonding at panel connector only?
thank you