texted customer a little while back with estimate for hot tub installation.I didn't like the idea of the text instead of personally deliver it myself, but i'm sick today and i was trying to see if i could line this one up for tomorrow if he agreed with estimate.
Tipycal install.;
About 60 ' of 6/3 w/ground NM from main to hottub 50 amp GFCI subpanel. From there LFNC to tub. Had to replace Ceiling fan with suitable plastic firxture, onether porch light needs to be swaped, and make sure all this is GFCI protected. Make a general purpose recept. GFCI protected.
Wall repairs ,if any holes need to be cut, is included in bid.
Materials and inspections fees included ($60.00 worth in fees)
Total estimate: $1,400.00
He called me i explained this to him, he said he'd talk to his wife and then let me know.
Texted me back sayin i didn't give him an estimate on the time. Do what?????
Since when i'm supposed to give an estimate with detail hourly rate and all.
I feel like telling him: that the time was as long as it takes.
But i'm running a business so i need to be politically correct, so i told him estimate based on 1 day work, 2 men , plus time involve in picking up materials and getting inspections.
i tell you things you got to do te make a living.
Tipycal install.;
About 60 ' of 6/3 w/ground NM from main to hottub 50 amp GFCI subpanel. From there LFNC to tub. Had to replace Ceiling fan with suitable plastic firxture, onether porch light needs to be swaped, and make sure all this is GFCI protected. Make a general purpose recept. GFCI protected.
Wall repairs ,if any holes need to be cut, is included in bid.
Materials and inspections fees included ($60.00 worth in fees)
Total estimate: $1,400.00
He called me i explained this to him, he said he'd talk to his wife and then let me know.
Texted me back sayin i didn't give him an estimate on the time. Do what?????
Since when i'm supposed to give an estimate with detail hourly rate and all.
I feel like telling him: that the time was as long as it takes.
But i'm running a business so i need to be politically correct, so i told him estimate based on 1 day work, 2 men , plus time involve in picking up materials and getting inspections.
i tell you things you got to do te make a living.