I've been in the VFD industry for 20 years and understand the problems associated with dv/dt and long lead lengths. So please do not discuss the effect peak voltage has on the motor or best practice in motor lead length. I'd like this discussion to be very specific to voltage drop at the motor.
Recently I had a discussion with a senior application engineer that provided voltage drop calculations for a 480V 2,200' length of cable between the motor and the drive. The cable is double 4/0 and the motor load is 190 nameplate. There is a TCI dv/dt filer in the motor circuit as well. His calculations included some inductive reactance estimates that would add to the standard resistive voltage drop. Standard resistive voltage drop was about 15-19V for this application. His calculations were more like 70-100V drop.
Here is what I'm searching for.
For long lead lengths between the motor and VFD does anyone have a spreadsheet calculator, or website one, that would factor in the Inductive reactance to arrive at an overall impedance to get a worst case voltage drop?
I'm assuming that switching frequency would be a factor as well as cable conductor orientation.
Thanks for the assistance.
Recently I had a discussion with a senior application engineer that provided voltage drop calculations for a 480V 2,200' length of cable between the motor and the drive. The cable is double 4/0 and the motor load is 190 nameplate. There is a TCI dv/dt filer in the motor circuit as well. His calculations included some inductive reactance estimates that would add to the standard resistive voltage drop. Standard resistive voltage drop was about 15-19V for this application. His calculations were more like 70-100V drop.
Here is what I'm searching for.
For long lead lengths between the motor and VFD does anyone have a spreadsheet calculator, or website one, that would factor in the Inductive reactance to arrive at an overall impedance to get a worst case voltage drop?
I'm assuming that switching frequency would be a factor as well as cable conductor orientation.
Thanks for the assistance.