I have a client that has requested we pull telephone cables 10 floors. I suggested we make a service loop for support but the building IT manager advised to run the cable in their existing 8" conduit and no support for the 110 lft drop would be necessary. I can not find the requirements for support when running this vertical distance. Can someone point me in the right direction. Thanks, Whiskeredone