pipe_bender
Senior Member
- Location
- Boston
- Occupation
- Electrician
I like your humor, It is really interesting how different it is in different areas
I am not sure when or if it changed but here is the code section:
I am not sure when or if it changed but here is the code section:
It says the connection has to be accessible.250.24(A)(1) General. The grounding electrode conductor connection
shall be made at any accessible point from the load end of the
overhead service conductors, service drop, underground service
conductors, or service lateral to, including the terminal or bus to
which the grounded service conductor is connected at the service
disconnecting means.