Here is a solution for the customer that wants both.

Sorry, hit post instead of preview. My guess is that this was originally a drop that was value engineered to underground. Overhead to underground is a common request here after hurricanes, but I have never seen this before.
Other than height requirements is there any nec issues involved?
Other than height requirements is there any nec issues involved?
IMO the NEC does not apply after the drip loop from the weatherhead.
IMO the NEC does not apply after the drip loop from the weatherhead.