Chris3585
Member
- Location
- Smyrna, Georgia
I am working on a project with multiple 4000 amp, 480 volt electrical services. The contractor has proposed grouping the phase conductors for the parallel sets to make installation easier and also to reduce the stress on the lugs.
Is it acceptable to group the phase conductors? I think that this type of installation would be in possible violation with NEC 300.20(B) since the exterior pad mounted transformer can not be vented. The contractors disagrees and says that we would not be in violation because we will not be passing through any form of hole or cut-out in ferrous metal resulting in unwanted heating of the surrounding metal (as there is not bottom in either the transformer or switchgear).
Does anyone else have an opinion on this?
Thank you,
Chris
Is it acceptable to group the phase conductors? I think that this type of installation would be in possible violation with NEC 300.20(B) since the exterior pad mounted transformer can not be vented. The contractors disagrees and says that we would not be in violation because we will not be passing through any form of hole or cut-out in ferrous metal resulting in unwanted heating of the surrounding metal (as there is not bottom in either the transformer or switchgear).
Does anyone else have an opinion on this?
Thank you,
Chris