mgookin
Senior Member
- Location
- Fort Myers, FL
- Occupation
- Retired inspector, plans examiner & building official
Do like the CIA does. You need cameras watching your cameras.
The mirror idea is a hell of a thought, simple. I will try that if I have to record again. So far, so good. No outages since Weds. the 6th. It is good, yet infuriating that it doesn't happen as I cannot identify the cause.
I will upload another video with the sequential "black screen" and provide a link to them.
Nearly every panel I recall with an LAL main breaker had a lock provision for the door - unless it was a cover with no door.Lock the cover
Sent from my E6782 using Tapatalk
The mirror idea is a hell of a thought, simple. I will try that if I have to record again. So far, so good. No outages since Weds. the 6th. It is good, yet infuriating that it doesn't happen as I cannot identify the cause.
I will upload another video with the sequential "black screen" and provide a link to them.
RTL:
Can you describe the timeline and events between the two films?
I'm guessing you found the breaker off and the camera off?
Did you turn the camera back on?
How much time is missing from video if the two were stitched together?
I took a screen shot from each video and loaded them into autocad full scale.
I placed a vertical construction line in the middle of the emt at the left side of the panel and another construction line at the left side of the label which is on the inside of the door.
Both are the same distance apart. There is no zoom action going on. Somebody moved that camera.