noon9elec
Member
- Location
- Bourne, MA
- Occupation
- Self employed Electrical Contractor
I have yet to see it in the NEC, but does it say any where that it is necessary to megger or doe an insulation resistance test on existing knob/tube, MC, NM cables. A simple panel change in an older building is turning into a mini nightmare now that an Engineer is involved. The Engineer is saying that "meggering" is not only required, but that a moral obligation should be employed. I don't know, I thought it was a typical panel change. I can't control what circuits are doing down stream. any thoughts? Thank you